This is the work from engineering student from Thammasat University TEP/TEPE program. After hours of working, we gather all of our spirit to accomplish this work.
Showing posts with label TEPE. Show all posts
Showing posts with label TEPE. Show all posts
Monday, June 18, 2012
Group 1 TEP/TEPE Surveying Field Camp
This picture is our landscape model from 2012 survey camp. it shows topographical landscape of buildings around the survey camp.
This picture is the building that we stayed at survey camp. We made this picture from google sketch up. We learned a lot from this program, because in the future we can use this program for showing the building that we make.
This one is also the model that show all the building and roads that we stay in survey camp.
This one made from google sketch up, it shows all the contour lines and the buildings.
This one is the topographical map. it shows all the contour line and all the building that we stayed in survey camp. This map is very useful ,because we will know all the elevation and location of the buildings from this map.
1. Apiporn Singhakowin
2. Phuwanat Sangkhayanon
3. Saravut Rojtanapong
4. Kitipoom Techathananont
5. Techit Chaiyasut
6.Veerapong Suejindaphorn
7. Prapatsorn Sida
8. Jeerawut Sae-Liu
9. Chollawit Wannachotipanat
Sunday, June 26, 2011
Group 1 TEP/TEPE WangTakrai 2011



-Volume =72634 m^3 (no volume adjustment done)
- closure error => 1:46 super bad
- SketchUp Okay
- only topo map accepted
- Every other things re-summit
1.) Grantraporn Panupattanapong
2.) Worawat Temboonsak
3.) Kantapon Mongkonkiattipor
4.) Thanakorn Malithong
5.) Kiattiwat Tangchalernkun
6.) Krittaya Ongkhase
7.) Nutthikan utree
Thursday, April 7, 2011
Group 3 Surveying Field Camp 2011 Wang-Ta-Krai
May 3, 2011 Group 3 (TEP/TEPE) presents group work by Mr. Rattakit Kittimunkong, Tanic, Suradech, Phanu, Korawit
- Traverse: angular error 2-deg 50-min 1-sec (0-deg 5-min 45.42-sec) Precision?
- transfer of Elev: error ? quality?
- photo of physical model?
Present Google SketchUp 8 improved work by Group 3 TEP/TEPE a Model of Wang-Ta-Krai by Suradech Wongveerakhant on April 22, 2011
- Google SketchUp 8 work: Marginal Okay

Group 3 TEP/TEPE Google SketchUp 8 Model of Wang-Ta-Krai

Group Members
Suwinai
Mr.Rattakit Kittimunkong
Phanu
Korawit
Suradech
Mr.PATCHARAPOL SRIPOL
Tanic
- Traverse: angular error 2-deg 50-min 1-sec (0-deg 5-min 45.42-sec) Precision?
- transfer of Elev: error ? quality?
- photo of physical model?
Present Google SketchUp 8 improved work by Group 3 TEP/TEPE a Model of Wang-Ta-Krai by Suradech Wongveerakhant on April 22, 2011
- Google SketchUp 8 work: Marginal Okay

Group 3 TEP/TEPE Google SketchUp 8 Model of Wang-Ta-Krai

Group Members
Suwinai
Mr.Rattakit Kittimunkong
Phanu
Korawit
Suradech
Mr.PATCHARAPOL SRIPOL
Tanic
Labels:
TEP,
TEPE,
Wang-Ta-Krai 2011,
เอฟ รออยู่....
TEP/TEPE Surveying Field Camp Group 2: Wang-Ta-Krai
June 9, 2011 by Mr.Peerasit
- Traverse okay (precision 1/47 )
- all works have been submitted
June 6, 2011 by Mr.Peerasit
- topo-map okay
- calculation of traverse (adjust angles/azimuths)
- V = 77706m^3 (no 10% adjustment)
31 May Mr.Peerasit (only one)
- topo-map add angle and direction of angle measurement
- determination of volume - clear explanation needed
- SketchUp Okay

April 21, 2011 submitted work by Mr.Keerati (only one)
- re-submitted adjustment of all data
April 20, 2011 submitted work by Mr.Peerasit (only one)
- Configuration of housing in topo map needed check up again
- Recompute volume
- SketchUp - added bridge to complete the road
- still No Traverse / elevation correction / adjustment submitted
------------
April 11, 2011 submitted work by Mr.Peerasit (only one)
Suggestions for improvement
- Recompute volume
- Topographic map
- No Traverse / elevation correction / adjustment
- No cross check / double check
- Recheck sketchup
- Resubmit all work April 21
TEP/TEPE Surveying Field Camp Group 2: Wang-Ta-Krai
- Traverse okay (precision 1/47 )
- all works have been submitted
June 6, 2011 by Mr.Peerasit
- topo-map okay
- calculation of traverse (adjust angles/azimuths)
- V = 77706m^3 (no 10% adjustment)
31 May Mr.Peerasit (only one)
- topo-map add angle and direction of angle measurement
- determination of volume - clear explanation needed
- SketchUp Okay

April 21, 2011 submitted work by Mr.Keerati (only one)
- re-submitted adjustment of all data
April 20, 2011 submitted work by Mr.Peerasit (only one)
- Configuration of housing in topo map needed check up again
- Recompute volume
- SketchUp - added bridge to complete the road
- still No Traverse / elevation correction / adjustment submitted
------------
April 11, 2011 submitted work by Mr.Peerasit (only one)
Suggestions for improvement
- Recompute volume
- Topographic map
- No Traverse / elevation correction / adjustment
- No cross check / double check
- Recheck sketchup
- Resubmit all work April 21
TEP/TEPE Surveying Field Camp Group 2: Wang-Ta-Krai
Labels:
TEP,
TEPE,
Wang-Ta-Krai 2011
Tuesday, April 5, 2011
TEP/TEPE Partial List Registered Students for Surveying Field Camp
ชวิน ล้อจักรชัย
กรณ์ เอี่ยมสถาพร
กรรณตราภรณ์ ภาณุพัฒนพงศ์
วรวัช เต็มบุญศักดิ์
ฐิติ คุณาฤทธิพล
กันตภณ มงคลเกียรติพร
ศรัณยุ สวาสดิ์รัตน์
ชลภพ จงสถิตไพบูลย์
สุวินัย กิตติเจริญฤกษ์
ธนากร มะลิทอง
ณัฐวุฒิ บุญมี
เกียรติวัฒน์ ตั้งเฉลิมกุล
กฤตยา องคะเส
ธนิก ชนินทร์สถาปัตย์
กิตติศักดิ์ โล่ห์วนิชชัย
สุรเดช วงศ์วีรขันธ์
ธนเดช ศรีประสงค์
พชร วุฑฒิชาติ
นัฐิกานต์ อุตรี
รัฐกิตต์ กิตติมั่นคง
ชวิน ล้อจักรชัย
กรณ์ เอี่ยมสถาพร
กรรณตราภรณ์ ภาณุพัฒนพงศ์
วรวัช เต็มบุญศักดิ์
ฐิติ คุณาฤทธิพล
กันตภณ มงคลเกียรติพร
ศรัณยุ สวาสดิ์รัตน์
ชลภพ จงสถิตไพบูลย์
สุวินัย กิตติเจริญฤกษ์
ธนากร มะลิทอง
ณัฐวุฒิ บุญมี
เกียรติวัฒน์ ตั้งเฉลิมกุล
กฤตยา องคะเส
ธนิก ชนินทร์สถาปัตย์
กิตติศักดิ์ โล่ห์วนิชชัย
สุรเดช วงศ์วีรขันธ์
ธนเดช ศรีประสงค์
พชร วุฑฒิชาติ
นัฐิกานต์ อุตรี
รัฐกิตต์ กิตติมั่นคง
Group photos-ภาพหมู่และเก็บตกค่ายวิศวกรรมสำรวจ 2554 วังตะไคร้
Group photos-ภาพหมู่และเก็บตกค่ายวิศวกรรมสำรวจ 2554 วังตะไคร้
Labels:
Camping,
Civil Engineering,
Surveying Engineering,
TEP,
TEPE,
คณะิวิศวกรรมศาสตร์,
ธรรมศาสตร์
TEP/TEPE Civil Engineering Students Participate in Surveying Field Camp 2011
TEP/TEPE Civil Engineering Sophomore Students Participate in Surveying Field Camp at Wang-Ta-Krai, Nakornnayok Province, March 18-22, 2011.
First meeting to grab all assignments to produce topographic map, architect model, Google SketchUp Model. In addition to perform close-loop traverse, cross-check and double-check should be frequently perform to maintain quality of assigned work. Don't forget to compute volume if the water stream crook were to be filled.
The instrument setup is well established and now I am ready to do the job.
What are you three standing there for?
Sweet smile - I am happy to be here.
It is not heavy, I can carry by myself.
Eating breakfast at 6.30.
Let me wash my face ..
I will have to clean my teeth ..
Tightening the instrument to the tripod. I will make sure it is locked.
Labels:
Camping,
Civil Engineering,
Google SketchUp,
Setting instrument,
TEP,
TEPE,
Thammasat
Subscribe to:
Posts (Atom)